The drywall was delivered Wednesday morning and by that afternoon we began installing it. The hardest sheets to install are the large ceiling boards in the back room. It took a few of us to get them up but we did that right away, and everything has gone smoothly since then!
April 26, 2007
Drywall!
The drywall was delivered Wednesday morning and by that afternoon we began installing it. The hardest sheets to install are the large ceiling boards in the back room. It took a few of us to get them up but we did that right away, and everything has gone smoothly since then!
April 24, 2007
Utilities
The Quiet House's new utility systems are in!
We've now got two new septic tanks, a water line, the phone line, and electrical lines in. They are underground, and it was difficult to excavate the area because the ground here is hardpan, but it makes for a very firm foundation and a "house built on a rock."
Camp had to sustain some superficial disturbance on the grounds to get all these new systems in, but grass seed is on the way to have the famous Bow-Isle green back before summer starts.
Exterior: Whole and Complete
The outside of the quiet house is now completely finished! It has it's lining plastic trimmed, windows trimmed, corners finished and all the siding is up, on and looking good, as well as all the gutters and the chimney on the roof.
The only parts that aren't completely done are the decorative braces on the front and back deck boards which will be completed at a later date. We're now focusing on lining the inside of the building with vapor barrier plastic so it will be prepped to start hanging drywall on Wednesday.
Interior: Vapor Barrier
Today we lined most of the building with a second vapor barrier: large sheets of plastic that help keep the inside of the building from being as wet as the outside. We then sealed it and got most of it taped as well. Once we finish this phase, we can begin hanging drywall and installing the ceiling.
April 18, 2007
The Interior
April 11, 2007
April 10, 2007
Let the work continue!
April 3, 2007
Phase 3: Framing
Phase 2: Foundation